Structure 4996400000000 · Boone County, IL

Spring Center RD over I 90

Carries Spring Center RD over I 90, 3 Mi W Mchenry Co.

Overall conditionGood

Set by its lowest-rated component: Substructure at 7 of 9.

How ratings work
Deck8/9 · Very Good
Superstructure8/9 · Very Good
Substructuresets the rating7/9 · Good
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
SEMI-TRUCK · 72 FT262 FT OVERALL50 FT0ELEVATION · LENGTHS TO SCALE
Deck 8/9Superstructure 8/9Substructure 7/9 · sets the rating

262 ft end to end, longest span 133 ft: about 4 semi-trucks nose to tail. Lengths and the semi-truck on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a multi-beam bridge.

Built201610 years old
Length262.1 ft79.9 m
Daily traffic75counted 2023
Last inspectedJuly 2023every 24 months

Location

StateIllinois
CountyBoone
Location3 Mi W Mchenry Co
CarriesSpring Center RD
CrossesI 90
Coordinates42.22509, -88.76397

Physical Characteristics

MaterialPrestressed Concrete Continuous
DesignStringer/Multi-beam
Total Length262.1 ft (79.9 m)
Max Span132.9 ft (40.5 m)
Deck Width35.4 ft (10.8 m)
Deck Area862.9 sq m
Main Spans2
Year Built2016

Traffic

Avg Daily Traffic75 (2023)
Truck Traffic23%
Lanes On Bridge2
Lanes Under Bridge6

Inspection & Ownership

Last InspectionJuly 2023
Inspection FrequencyEvery 24 months
OwnerState Toll Authority
Historical SignificanceBridge is not eligible for the National Register
Scour CriticalNot applicable
Structure Number004996400000000

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.