Structure 20593 · Lackawanna County, PA
Carries SR 0380 I-380 SB over SR 0690 Tr 690, Moscow Boro Over Tr 690.
Set by its lowest-rated component: Deck and Superstructure and Substructure at 7 of 9.
How ratings work113 ft end to end, longest span 54 ft. Lengths and the car on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a box-beam bridge.
| State | Pennsylvania |
| County | Lackawanna |
| Location | Moscow Boro Over Tr 690 |
| Carries | SR 0380 I-380 SB |
| Crosses | SR 0690 Tr 690 |
| Coordinates | 41.33386, -75.55586 |
| Material | Prestressed Concrete |
| Design | Box Beam - Multiple |
| Total Length | 112.9 ft (34.4 m) |
| Max Span | 54.1 ft (16.5 m) |
| Deck Width | 43.3 ft (13.2 m) |
| Deck Area | 454.1 sq m |
| Main Spans | 3 |
| Year Built | 1975 (reconstructed 2009) |
| Avg Daily Traffic | 12,049 (2024) |
| Truck Traffic | 20% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 2 |
| Last Inspection | September 2023 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Scour Critical | Not applicable |
| Structure Number | 000000000020593 |
Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."
A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.