Structure 5237A0000000 · Kitsap County, WA

SR 16 Northbound over SR 166

Carries SR 16 Northbound over SR 166, 9.8 N Pierce Co.

Overall conditionFair

Set by its lowest-rated component: Deck and Superstructure at 6 of 9.

How ratings work
Decksets the rating6/9 · Satisfactory
Superstructuresets the rating6/9 · Satisfactory
Substructure7/9 · Good
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
SEMI-TRUCK · 72 FT234 FT OVERALL50 FT0ELEVATION · LENGTHS TO SCALE
Deck 6/9 · sets the ratingSuperstructure 6/9 · sets the ratingSubstructure 7/9

234 ft end to end, longest span 85 ft: about 3 semi-trucks nose to tail. Lengths and the semi-truck on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a box-beam bridge.

Built195670 years old
Length233.9 ft71.3 m
Daily traffic30,756counted 2023
Last inspectedAugust 2023every 24 months

Location

StateWashington
CountyKitsap
Location9.8 N Pierce Co
CarriesSR 16 Northbound
CrossesSR 166
Coordinates47.52817, -122.67750

Physical Characteristics

MaterialConcrete Continuous
DesignBox Beam - Multiple
Total Length233.9 ft (71.3 m)
Max Span85.0 ft (25.9 m)
Deck Width33.8 ft (10.3 m)
Deck Area734.4 sq m
Main Spans3
Year Built1956

Traffic

Avg Daily Traffic30,756 (2023)
Truck Traffic5%
Lanes On Bridge2
Lanes Under Bridge2

Inspection & Ownership

Last InspectionAugust 2023
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Scour CriticalNot applicable
Structure Number0005237A0000000

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.