Structure 1504320 · Columbiana County, OH

SR 170 over Over Us30 & Sr7

Carries SR 170 over Over Us30 & Sr7, At Interchange W/ Us30.

Overall conditionFair

Set by its lowest-rated component: Deck and Substructure at 6 of 9.

How ratings work
Decksets the rating6/9 · Satisfactory
Superstructure7/9 · Good
Substructuresets the rating6/9 · Satisfactory
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
SEMI-TRUCK · 72 FT175 FT OVERALL25 FT0ELEVATION · LENGTHS TO SCALE
Deck 6/9 · sets the ratingSuperstructure 7/9Substructure 6/9 · sets the rating

175 ft end to end, longest span 50 ft: about 2 semi-trucks nose to tail. Lengths and the semi-truck on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a multi-beam bridge.

Built1964rebuilt 2002
Length174.9 ft53.3 m
Daily traffic12,761counted 2015
Last inspectedFebruary 2024every 12 months

Location

StateOhio
CountyColumbiana
LocationAt Interchange W/ Us30
CarriesSR 170
CrossesOver Us30 & Sr7
Coordinates40.66518, -80.59209

Physical Characteristics

MaterialSteel Continuous
DesignStringer/Multi-beam
Total Length174.9 ft (53.3 m)
Max Span49.9 ft (15.2 m)
Deck Width76.4 ft (23.3 m)
Deck Area1241.9 sq m
Main Spans4
Year Built1964 (reconstructed 2002)

Traffic

Avg Daily Traffic12,761 (2015)
Truck Traffic9%
Lanes On Bridge4
Lanes Under Bridge4

Inspection & Ownership

Last InspectionFebruary 2024
Inspection FrequencyEvery 12 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Scour CriticalNot applicable
Structure Number1504320

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.