Structure 2C 838 · Salt Lake County, UT

Sr-201eb To I-15NB over On-ramp 900 W.tosr-201eb

Carries Sr-201eb To I-15NB over On-ramp 900 W.tosr-201eb, E.of 900 W.intchg.@2.

Overall conditionFair

Set by its lowest-rated component: Deck and Substructure at 6 of 9.

How ratings work
Decksets the rating6/9 · Satisfactory
Superstructure7/9 · Good
Substructuresets the rating6/9 · Satisfactory
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
SEMI-TRUCK · 72 FT992 FT OVERALL200 FT0ELEVATION · LENGTHS TO SCALE
Deck 6/9 · sets the ratingSuperstructure 7/9Substructure 6/9 · sets the rating

992 ft end to end, longest span 211 ft: about 2.8 football fields. Lengths and the semi-truck on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a multi-beam bridge.

Built200026 years old
Length992.1 ft302.4 m
Daily traffic94,085counted 2014
Last inspectedAugust 2024every 24 months

Location

StateUtah
CountySalt Lake
LocationE.of 900 W.intchg.@2
CarriesSr-201eb To I-15NB
CrossesOn-ramp 900 W.tosr-201eb
Coordinates40.72384, -111.91418

Physical Characteristics

MaterialSteel Continuous
DesignStringer/Multi-beam
Total Length992.1 ft (302.4 m)
Max Span210.6 ft (64.2 m)
Deck Width42.3 ft (12.9 m)
Deck Area3901.0 sq m
Main Spans6
Year Built2000

Traffic

Avg Daily Traffic94,085 (2014)
Truck Traffic21%
Lanes On Bridge2
Lanes Under Bridge1

Inspection & Ownership

Last InspectionAugust 2024
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Scour CriticalNot applicable
Structure Number2C 838

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.