Structure F 673 · Utah County, UT

Sr-265 Int.x-rd. over I-15 (sr-15) Nbl And Sbl

Carries Sr-265 Int.x-rd. over I-15 (sr-15) Nbl And Sbl, 1200 So. Intchg. In Orem.

Overall conditionFair

Set by its lowest-rated component: Deck at 6 of 9.

How ratings work
Decksets the rating6/9 · Satisfactory
Superstructure7/9 · Good
Substructure7/9 · Good
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
SEMI-TRUCK · 72 FT216 FT OVERALL25 FT0ELEVATION · LENGTHS TO SCALE
Deck 6/9 · sets the ratingSuperstructure 7/9Substructure 7/9

216 ft end to end, longest span 107 ft: about 3 semi-trucks nose to tail. Lengths and the semi-truck on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a multi-beam bridge.

Built200125 years old
Length216.2 ft65.9 m
Daily traffic23,908counted 2022
Last inspectedDecember 2023every 13 months

Location

StateUtah
CountyUtah
Location1200 So. Intchg. In Orem
CarriesSr-265 Int.x-rd.
CrossesI-15 (sr-15) Nbl And Sbl
Coordinates40.27534, -111.71895

Physical Characteristics

MaterialPrestressed Concrete Continuous
DesignStringer/Multi-beam
Total Length216.2 ft (65.9 m)
Max Span107.0 ft (32.6 m)
Deck Width232.9 ft (71 m)
Deck Area4678.9 sq m
Main Spans2
Year Built2001

Traffic

Avg Daily Traffic23,908 (2022)
Truck Traffic23%
Lanes On Bridge6
Lanes Under Bridge10

Inspection & Ownership

Last InspectionDecember 2023
Inspection FrequencyEvery 13 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Scour CriticalNot applicable
Structure Number0F 673

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.