Structure HY0000000 · King County, WA

SR 509 over Joes Creek

Carries SR 509 over Joes Creek, 2.1 N Pierce Co.

Overall conditionFair

Set by its lowest-rated component: Superstructure and Substructure at 6 of 9.

How ratings work
Deck7/9 · Good
Superstructuresets the rating6/9 · Satisfactory
Substructuresets the rating6/9 · Satisfactory
Channelnot part of overall8/9 · Very Good
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
SEMI-TRUCK · 72 FT264 FT OVERALL50 FT0ELEVATION · LENGTHS TO SCALE
Deck 7/9Superstructure 6/9 · sets the ratingSubstructure 6/9 · sets the rating

264 ft end to end, longest span 72 ft: about 4 semi-trucks nose to tail. Lengths and the semi-truck on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a girder bridge.

Built1929rebuilt 1996
Length264.1 ft80.5 m
Daily traffic3,913counted 2023
Last inspectedJuly 2024every 24 months

Location

StateWashington
CountyKing
Location2.1 N Pierce Co
CarriesSR 509
CrossesJoes Creek
Coordinates47.32667, -122.37697

Physical Characteristics

MaterialSteel Continuous
DesignGirder and Floorbeam
Total Length264.1 ft (80.5 m)
Max Span71.9 ft (21.9 m)
Deck Width36.1 ft (11 m)
Deck Area885.5 sq m
Main Spans5
Year Built1929 (reconstructed 1996)

Traffic

Avg Daily Traffic3,913 (2023)
Truck Traffic5%
Lanes On Bridge2

Inspection & Ownership

Last InspectionJuly 2024
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Scour Critical9 — Foundation above flood level
Structure Number000000HY0000000

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.