Structure 2104210 · Delaware County, OH

SR 750 (powell Rd) over Olentangy River

Carries SR 750 (powell Rd) over Olentangy River, 0.01 Mi E Of Sr-315.

Overall conditionFair

Set by its lowest-rated component: Deck and Superstructure at 6 of 9.

How ratings work
Decksets the rating6/9 · Satisfactory
Superstructuresets the rating6/9 · Satisfactory
Substructure7/9 · Good
Channelnot part of overall6/9 · Satisfactory
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
SEMI-TRUCK · 72 FT164 FT OVERALL25 FT0ELEVATION · LENGTHS TO SCALE
Deck 6/9 · sets the ratingSuperstructure 6/9 · sets the ratingSubstructure 7/9

164 ft end to end, longest span 61 ft: about 2 semi-trucks nose to tail. Lengths and the semi-truck on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a multi-beam bridge.

Built198442 years old
Length164.4 ft50.1 m
Daily traffic17,341counted 2015
Last inspectedMarch 2024every 12 months

Location

StateOhio
CountyDelaware
Location0.01 Mi E Of Sr-315
CarriesSR 750 (powell Rd)
CrossesOlentangy River
Coordinates40.15692, -83.04562

Physical Characteristics

MaterialSteel Continuous
DesignStringer/Multi-beam
Total Length164.4 ft (50.1 m)
Max Span61.4 ft (18.7 m)
Deck Width41.3 ft (12.6 m)
Deck Area631.3 sq m
Main Spans3
Year Built1984

Traffic

Avg Daily Traffic17,341 (2015)
Truck Traffic2%
Lanes On Bridge2

Inspection & Ownership

Last InspectionMarch 2024
Inspection FrequencyEvery 12 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Scour Critical5 — Stable for scour
Structure Number2104210

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.