Structure 125542 · Lee County, FL

Trafalgar PKWY over Progress Canal

Carries Trafalgar PKWY over Progress Canal, 0.2mi W Of Chiquita BLVD.

Overall conditionGood

Set by its lowest-rated component: Deck and Superstructure and Substructure at 7 of 9.

How ratings work
Decksets the rating7/9 · Good
Superstructuresets the rating7/9 · Good
Substructuresets the rating7/9 · Good
Channelnot part of overall8/9 · Very Good
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
24 FT OVERALL25 FT0ELEVATION · LENGTHS TO SCALE
Deck 7/9Superstructure 7/9Substructure 7/9

24 ft end to end. Lengths are drawn to scale; at this length a semi-truck would be a speck. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a slab bridge.

Built197551 years old
Length24.0 ft7.3 m
Daily traffic9,000counted 2023
Last inspectedNovember 2023every 24 months

Location

StateFlorida
CountyLee
Location0.2mi W Of Chiquita BLVD
CarriesTrafalgar PKWY
CrossesProgress Canal
Coordinates26.62275, -82.01017

Physical Characteristics

MaterialPrestressed Concrete
DesignSlab
Total Length24.0 ft (7.3 m)
Max Span24.0 ft (7.3 m)
Deck Width63.6 ft (19.4 m)
Deck Area141.6 sq m
Main Spans1
Year Built1975

Traffic

Avg Daily Traffic9,000 (2023)
Truck Traffic5%
Lanes On Bridge2

Inspection & Ownership

Last InspectionNovember 2023
Inspection FrequencyEvery 24 months
OwnerCity/Municipal Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Scour CriticalUnknown
Structure Number125542

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.