Structure 16350700 · Jefferson County, GA

US 1 over Ogeechee River Overflow

Carries US 1 over Ogeechee River Overflow, 1.9 Mi S Of Louisville.

Overall conditionGood

Set by its lowest-rated component: Deck and Superstructure and Substructure at 8 of 9.

How ratings work
Decksets the rating8/9 · Very Good
Superstructuresets the rating8/9 · Very Good
Substructuresets the rating8/9 · Very Good
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
SEMI-TRUCK · 72 FT450 FT OVERALL50 FT0ELEVATION · LENGTHS TO SCALE
Deck 8/9Superstructure 8/9Substructure 8/9

450 ft end to end, longest span 50 ft: about 6 semi-trucks nose to tail. Lengths and the semi-truck on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a multi-beam bridge.

Built20242 years old
Length450.1 ft137.2 m
Daily traffic5,830counted 2024
Last inspectedJune 2024every 24 months

Location

StateGeorgia
CountyJefferson
Location1.9 Mi S Of Louisville
CarriesUS 1
CrossesOgeechee River Overflow
Coordinates32.97095, -82.39033

Physical Characteristics

MaterialConcrete
DesignStringer/Multi-beam
Total Length450.1 ft (137.2 m)
Max Span49.9 ft (15.2 m)
Deck Width39.4 ft (12 m)
Deck Area1646.4 sq m
Main Spans9
Year Built2024

Traffic

Avg Daily Traffic5,830 (2024)
Truck Traffic1%
Lanes On Bridge2

Inspection & Ownership

Last InspectionJune 2024
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Scour Critical5 — Stable for scour
Structure Number000000016350700

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.

Nearby Bridges