Structure G-22-BY · Lincoln County, CO

US 24 Ml over Big Sandy Creek

Carries US 24 Ml over Big Sandy Creek, Lincoln/elbert Line.

Overall conditionFair

Set by its lowest-rated component: Deck and Substructure at 6 of 9.

How ratings work
Decksets the rating6/9 · Satisfactory
Superstructure7/9 · Good
Substructuresets the rating6/9 · Satisfactory
Channelnot part of overall8/9 · Very Good
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
SEMI-TRUCK · 72 FT495 FT OVERALL100 FT0ELEVATION · LENGTHS TO SCALE
Deck 6/9 · sets the ratingSuperstructure 7/9Substructure 6/9 · sets the rating

495 ft end to end, longest span 122 ft: about 7 semi-trucks nose to tail. Lengths and the semi-truck on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a multi-beam bridge.

Built200026 years old
Length495.1 ft150.9 m
Daily traffic3,000counted 2020
Last inspectedFebruary 2025every 24 months

Location

StateColorado
CountyLincoln
LocationLincoln/elbert Line
CarriesUS 24 Ml
CrossesBig Sandy Creek
Coordinates39.26489, -103.71463

Physical Characteristics

MaterialPrestressed Concrete Continuous
DesignStringer/Multi-beam
Total Length495.1 ft (150.9 m)
Max Span121.7 ft (37.1 m)
Deck Width43.0 ft (13.1 m)
Deck Area1976.8 sq m
Main Spans4
Year Built2000

Traffic

Avg Daily Traffic3,000 (2020)
Truck Traffic16%
Lanes On Bridge2

Inspection & Ownership

Last InspectionFebruary 2025
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Scour Critical8 — Stable, low risk
Structure NumberG-22-BY

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.