Structure 8885 002 16886 · Morrow County, OR
Carries US 730 (hwy 2) over Usrs Canal, 9.8 Mi W Umatilla Co Line.
125 ft end to end, longest span 49 ft. Lengths and the semi-truck on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a tee-beam bridge.
| State | Oregon |
| County | Morrow |
| Location | 9.8 Mi W Umatilla Co Line |
| Carries | US 730 (hwy 2) |
| Crosses | Usrs Canal |
| Coordinates | 45.84125, -119.60948 |
| Material | Concrete Continuous |
| Design | Tee Beam |
| Total Length | 125.0 ft (38.1 m) |
| Max Span | 48.9 ft (14.9 m) |
| Deck Width | 34.4 ft (10.5 m) |
| Deck Area | 400.1 sq m |
| Main Spans | 3 |
| Year Built | 1962 |
| Avg Daily Traffic | 4,085 (2022) |
| Truck Traffic | 12% |
| Lanes On Bridge | 2 |
| Last Inspection | February 2023 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Historical significance is not determined |
| Scour Critical | 8 — Stable, low risk |
| Structure Number | 08885 002 16886 |
Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."
A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.