Structure W25025ANVDOT634 · Hampden County, MA

Us202 /st10/shmptn over Rr Pvrr

Carries Us202 /st10/shmptn over Rr Pvrr, 50 Ft S Jct Of Arch Road.

Overall conditionFair

Set by its lowest-rated component: Superstructure at 5 of 9.

How ratings work
Deck6/9 · Satisfactory
Superstructuresets the rating5/9 · Fair
Substructure7/9 · Good
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
CAR · 15 FT44 FT OVERALL25 FT0ELEVATION · LENGTHS TO SCALE
Deck 6/9Superstructure 5/9 · sets the ratingSubstructure 7/9

44 ft end to end. Lengths and the car on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a box-beam bridge.

Built199729 years old
Length43.6 ft13.3 m
Daily traffic28,421counted 2022
Last inspectedDecember 2023every 24 months

Location

StateMassachusetts
CountyHampden
Location50 Ft S Jct Of Arch Road
CarriesUs202 /st10/shmptn
CrossesRr Pvrr
Coordinates42.14061, -72.73392

Physical Characteristics

MaterialPrestressed Concrete
DesignBox Beam - Single/Spread
Total Length43.6 ft (13.3 m)
Max Span39.7 ft (12.1 m)
Deck Width73.5 ft (22.4 m)
Deck Area297.9 sq m
Main Spans1
Year Built1997

Traffic

Avg Daily Traffic28,421 (2022)
Truck Traffic5%
Lanes On Bridge5

Inspection & Ownership

Last InspectionDecember 2023
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Scour CriticalNot applicable
Structure NumberW25025ANVDOT634

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.