Structure 43318400000000 · Jo Daviess County, IL

W. Stagecoach Trai over Galena River &ccp Rr

Carries W. Stagecoach Trai over Galena River &ccp Rr, .3 Mi. E. Of Galena.

Overall conditionGood

Set by its lowest-rated component: Superstructure at 7 of 9.

How ratings work
Deck8/9 · Very Good
Superstructuresets the rating7/9 · Good
Substructure8/9 · Very Good
Channelnot part of overall8/9 · Very Good
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
SEMI-TRUCK · 72 FT782 FT OVERALL100 FT0ELEVATION · LENGTHS TO SCALE
Deck 8/9Superstructure 7/9 · sets the ratingSubstructure 8/9

782 ft end to end, longest span 120 ft: about 2.2 football fields. Lengths and the semi-truck on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a multi-beam bridge.

Built199927 years old
Length781.8 ft238.3 m
Daily traffic2,150counted 2021
Last inspectedMarch 2024every 24 months

Location

StateIllinois
CountyJo Daviess
Location.3 Mi. E. Of Galena
CarriesW. Stagecoach Trai
CrossesGalena River &ccp Rr
Coordinates42.42191, -90.40357

Physical Characteristics

MaterialSteel Continuous
DesignStringer/Multi-beam
Total Length781.8 ft (238.3 m)
Max Span120.1 ft (36.6 m)
Deck Width33.1 ft (10.1 m)
Deck Area2406.8 sq m
Main Spans7
Year Built1999

Traffic

Avg Daily Traffic2,150 (2021)
Truck Traffic8%
Lanes On Bridge2

Inspection & Ownership

Last InspectionMarch 2024
Inspection FrequencyEvery 24 months
OwnerCounty Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Scour Critical8 — Stable, low risk
Structure Number043318400000000

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.