Structure 2NC2022 · Onslow County, NC

Wilson Boulevard over Northeast Creek

Carries Wilson Boulevard over Northeast Creek, 2.4 Km W Of Lejeune BLVD.

Overall conditionFair

Set by its lowest-rated component: Deck at 6 of 9.

How ratings work
Decksets the rating6/9 · Satisfactory
Superstructure7/9 · Good
Substructure7/9 · Good
Channelnot part of overall7/9 · Good
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
SEMI-TRUCK · 72 FT2,037 FT OVERALL250 FT0ELEVATION · LENGTHS TO SCALE
Deck 6/9 · sets the ratingSuperstructure 7/9Substructure 7/9

2,037 ft end to end, longest span 128 ft: about 5.7 football fields. Lengths and the semi-truck on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a multi-beam bridge.

Built201412 years old
Length2037.4 ft621 m
Daily traffic200counted 2014
Last inspectedOctober 2024every 24 months

Location

StateNorth Carolina
CountyOnslow
Location2.4 Km W Of Lejeune BLVD
CarriesWilson Boulevard
CrossesNortheast Creek
Coordinates34.72434, -77.37556

Physical Characteristics

MaterialPrestressed Concrete
DesignStringer/Multi-beam
Total Length2037.4 ft (621 m)
Max Span127.6 ft (38.9 m)
Deck Width86.3 ft (26.3 m)
Deck Area16332.3 sq m
Main Spans16
Year Built2014

Traffic

Avg Daily Traffic200 (2014)
Truck Traffic10%
Lanes On Bridge4

Inspection & Ownership

Last InspectionOctober 2024
Inspection FrequencyEvery 24 months
OwnerNavy/Marines
Historical SignificanceBridge is not eligible for the National Register
Scour Critical5 — Stable for scour
Structure Number2NC2022

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.