Structure 30C0069 · Calaveras County, CA

Milton RD over Calaveras River

Carries Milton RD over Calaveras River, 0.8 M E. Of Jenny Lind RD.

Overall conditionFair

Set by its lowest-rated component: Deck at 5 of 9.

How ratings work
Decksets the rating5/9 · Fair
Superstructure6/9 · Satisfactory
Substructure7/9 · Good
Channelnot part of overall7/9 · Good
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
SEMI-TRUCK · 72 FT176 FT OVERALL25 FT0ELEVATION · LENGTHS TO SCALE
Deck 5/9 · sets the ratingSuperstructure 6/9Substructure 7/9

176 ft end to end, longest span 87 ft: about 2 semi-trucks nose to tail. Lengths and the semi-truck on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a box-beam bridge.

Built197947 years old
Length175.5 ft53.5 m
Daily traffic966counted 2009
Last inspectedFebruary 2025every 24 months

Location

StateCalifornia
CountyCalaveras
Location0.8 M E. Of Jenny Lind RD
CarriesMilton RD
CrossesCalaveras River
Coordinates38.09126, -120.87267

Physical Characteristics

MaterialConcrete Continuous
DesignBox Beam - Multiple
Total Length175.5 ft (53.5 m)
Max Span86.6 ft (26.4 m)
Deck Width28.5 ft (8.7 m)
Deck Area465.4 sq m
Main Spans2
Year Built1979

Traffic

Avg Daily Traffic966 (2009)
Truck Traffic4%
Lanes On Bridge2

Inspection & Ownership

Last InspectionFebruary 2025
Inspection FrequencyEvery 24 months
OwnerCounty Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Scour Critical5 — Stable for scour
Structure Number30C0069

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.