Structure 2484 000 00014 · Multnomah County, OR
Carries NE 33rd AVE over B-9 Over Uprr, 1 Block N Of Dekum ST.
Set by its lowest-rated component: Deck and Superstructure and Substructure at 6 of 9.
How ratings work275 ft end to end, longest span 63 ft: about 4 semi-trucks nose to tail. Lengths and the semi-truck on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a multi-beam bridge.
| State | Oregon |
| County | Multnomah |
| Location | 1 Block N Of Dekum ST |
| Carries | NE 33rd AVE |
| Crosses | B-9 Over Uprr |
| Coordinates | 45.57286, -122.63067 |
| Material | Concrete Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 274.9 ft (83.8 m) |
| Max Span | 63.0 ft (19.2 m) |
| Deck Width | 49.5 ft (15.1 m) |
| Deck Area | 1265.4 sq m |
| Main Spans | 12 |
| Year Built | 1929 (reconstructed 1938) |
| Avg Daily Traffic | 10,762 (2020) |
| Truck Traffic | 20% |
| Lanes On Bridge | 2 |
| Last Inspection | July 2024 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Historical significance is not determined |
| Scour Critical | Not applicable |
| Structure Number | 02484 000 00014 |
Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."
A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.