Structure 2485 000 00219 · Multnomah County, OR

NE 42nd AVE over B-75 X Lombard And Uprr

Carries NE 42nd AVE over B-75 X Lombard And Uprr, NE Portland.

Overall conditionFair

Set by its lowest-rated component: Deck and Superstructure at 6 of 9.

How ratings work
Decksets the rating6/9 · Satisfactory
Superstructuresets the rating6/9 · Satisfactory
Substructure7/9 · Good
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
SEMI-TRUCK · 72 FT299 FT OVERALL50 FT0ELEVATION · LENGTHS TO SCALE
Deck 6/9 · sets the ratingSuperstructure 6/9 · sets the ratingSubstructure 7/9

299 ft end to end, longest span 72 ft: about 4 semi-trucks nose to tail. Lengths and the semi-truck on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a multi-beam bridge.

Built193888 years old
Length298.9 ft91.1 m
Daily traffic8,234counted 2020
Last inspectedJuly 2024every 24 months

Location

StateOregon
CountyMultnomah
LocationNE Portland
CarriesNE 42nd AVE
CrossesB-75 X Lombard And Uprr
Coordinates45.57032, -122.61891

Physical Characteristics

MaterialSteel
DesignStringer/Multi-beam
Total Length298.9 ft (91.1 m)
Max Span71.9 ft (21.9 m)
Deck Width37.7 ft (11.5 m)
Deck Area1047.7 sq m
Main Spans5
Year Built1938

Traffic

Avg Daily Traffic8,234 (2020)
Truck Traffic10%
Lanes On Bridge2
Lanes Under Bridge4

Inspection & Ownership

Last InspectionJuly 2024
Inspection FrequencyEvery 24 months
OwnerCity/Municipal Highway Agency
Historical SignificanceHistorical significance is not determined
Scour CriticalNot applicable
Structure Number02485 000 00219

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.