Ramp To Pr-2 over Pr-2
Fair Condition18 years old3,800 vehicles/day
Location
| State | Puerto Rico |
| County | Hormigueros Municipio |
| Location | Over Km. 162.30 Of Pr-2 |
| Carries | Ramp To Pr-2 |
| Crosses | Pr-2 |
| Coordinates | 18.13740, -67.13307 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 8 (Very Good) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 238.5 ft (72.7 m) |
| Max Span | 119.1 ft (36.3 m) |
| Deck Width | 73.2 ft (22.3 m) |
| Deck Area | 1621.2 sq m |
| Main Spans | 2 |
| Year Built | 2008 |
Traffic
| Avg Daily Traffic | 3,800 (2017) |
| Truck Traffic | 5% |
| Lanes On Bridge | 4 |
| Lanes Under Bridge | 7 |
Inspection & Ownership
| Last Inspection | 323 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 028761 |