Structure 13565A0000000 · King County, WA

US 2 over Bn Rr (gn) Scenic

Carries US 2 over Bn Rr (gn) Scenic, 18.5 E Snohomish Co.

Overall conditionFair

Set by its lowest-rated component: Deck at 5 of 9.

How ratings work
Decksets the rating5/9 · Fair
Superstructure7/9 · Good
Substructure7/9 · Good
0 failed4 poor6 fair9 excellent

Elevation

Side view, colored by inspection rating
SEMI-TRUCK · 72 FT366 FT OVERALL50 FT0ELEVATION · LENGTHS TO SCALE
Deck 5/9 · sets the ratingSuperstructure 7/9Substructure 7/9

366 ft end to end, longest span 134 ft: about 5 semi-trucks nose to tail. Lengths and the semi-truck on the deck are drawn to the same scale. Each part is colored by its latest inspection rating. The inventory records lengths but not heights or the layout of the shorter spans, so those are drawn as typical for a multi-beam bridge.

Built199036 years old
Length366.1 ft111.6 m
Daily traffic5,590counted 2023
Last inspectedJuly 2024every 24 months

Location

StateWashington
CountyKing
Location18.5 E Snohomish Co
CarriesUS 2
CrossesBn Rr (gn) Scenic
Coordinates47.71239, -121.15033

Physical Characteristics

MaterialPrestressed Concrete
DesignStringer/Multi-beam
Total Length366.1 ft (111.6 m)
Max Span133.5 ft (40.7 m)
Deck Width50.9 ft (15.5 m)
Deck Area1729.8 sq m
Main Spans3
Year Built1990

Traffic

Avg Daily Traffic5,590 (2023)
Truck Traffic5%
Lanes On Bridge3

Inspection & Ownership

Last InspectionJuly 2024
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceHistorical significance is not determined
Scour CriticalNot applicable
Structure Number0013565A0000000

How Bridge Ratings Work

Inspectors rate each major part of a bridge (the deck you drive on, the superstructure of beams that holds it up, and the substructure of piers and abutments beneath) on a 0–9 scale. A bridge's overall condition is its lowest of those ratings, so one deteriorated component makes the whole bridge "poor."

0Failed
1Imminent failure
2Critical
3Serious
4Poor
5Fair
6Satisfactory
7Good
8Very good
9Excellent
Good · lowest component 7–9
Fair · lowest component 5–6
Poor · lowest component 0–4

A poor rating is not a closure. It means the bridge is flagged for priority repair or replacement; bridges judged unsafe are closed or posted with weight limits. The waterway (channel) rating is reported, but it does not count toward the overall classification.