Pr 53 Northbound over Channel

Good Condition31 years old9,800 vehicles/day

Location

StatePuerto Rico
CountyHumacao Municipio
Location6 Kms S. E. Of Humacao
CarriesPr 53 Northbound
CrossesChannel
Coordinates18.10560, -65.81955

Condition Ratings

Overall ConditionGood
Deck7 (Good)
Superstructure7 (Good)
Substructure7 (Good)
Channel/Waterway7 (Good)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialPrestressed Concrete
DesignStringer/Multi-beam
Total Length211.0 ft (64.3 m)
Max Span102.7 ft (31.3 m)
Deck Width44.0 ft (13.4 m)
Deck Area861.6 sq m
Main Spans3
Year Built1995

Traffic

Avg Daily Traffic9,800 (2017)
Truck Traffic7%
Lanes On Bridge2

Inspection & Ownership

Last Inspection624
Inspection FrequencyEvery 24 months
OwnerState Toll Authority
Historical SignificanceBridge is not eligible for the National Register
Structure Number024032

Nearby Bridges