Pr 53 over Pr 927

Fair Condition30 years old20,100 vehicles/day

Location

StatePuerto Rico
CountyHumacao Municipio
Location4 Kms Northeast Humacao
CarriesPr 53
CrossesPr 927
Coordinates18.18626, -65.79383

Condition Ratings

Overall ConditionFair
Deck6 (Satisfactory)
Superstructure7 (Good)
Substructure7 (Good)
Scour CriticalNot applicable

Physical Characteristics

MaterialPrestressed Concrete
DesignStringer/Multi-beam
Total Length115.5 ft (35.2 m)
Max Span101.0 ft (30.8 m)
Deck Width112.5 ft (34.3 m)
Deck Area1207.4 sq m
Main Spans1
Year Built1996

Traffic

Avg Daily Traffic20,100 (2017)
Truck Traffic4%
Lanes On Bridge4
Lanes Under Bridge3

Inspection & Ownership

Last Inspection823
Inspection FrequencyEvery 24 months
OwnerState Toll Authority
Historical SignificanceBridge is not eligible for the National Register
Structure Number024291

Nearby Bridges