Pr 53 Southbound over Pr 3

Fair Condition29 years old10,200 vehicles/day

Location

StatePuerto Rico
CountyHumacao Municipio
Location2 Kms. East Of Humacao
CarriesPr 53 Southbound
CrossesPr 3
Coordinates18.14394, -65.80387

Condition Ratings

Overall ConditionFair
Deck6 (Satisfactory)
Superstructure7 (Good)
Substructure7 (Good)
Scour CriticalNot applicable

Physical Characteristics

MaterialPrestressed Concrete
DesignStringer/Multi-beam
Total Length278.9 ft (85 m)
Max Span78.1 ft (23.8 m)
Deck Width44.0 ft (13.4 m)
Deck Area1,139 sq m
Main Spans4
Year Built1997

Traffic

Avg Daily Traffic10,200 (2017)
Truck Traffic5%
Lanes On Bridge2
Lanes Under Bridge5

Inspection & Ownership

Last Inspection723
Inspection FrequencyEvery 24 months
OwnerState Toll Authority
Historical SignificanceBridge is not eligible for the National Register
Structure Number023812

Nearby Bridges