Pr 3 92.8 Km over Pollalito Creek

Fair Condition108 years old8,800 vehicles/day

Location

StatePuerto Rico
CountyYabucoa Municipio
Location4.5 Km North Of Yabucoa
CarriesPr 3 92.8 Km
CrossesPollalito Creek
Coordinates18.07628, -65.86244

Condition Ratings

Overall ConditionFair
Deck6 (Satisfactory)
Superstructure5 (Fair)
Substructure6 (Satisfactory)
Channel/Waterway6 (Satisfactory)
Scour Critical4 — Foundations need monitoring

Physical Characteristics

MaterialSteel
DesignStringer/Multi-beam
Total Length20.0 ft (6.1 m)
Max Span20.0 ft (6.1 m)
Deck Width43.0 ft (13.1 m)
Deck Area79.9 sq m
Main Spans1
Year Built1918 (reconstructed 1984)

Traffic

Avg Daily Traffic8,800 (2017)
Truck Traffic4%
Lanes On Bridge2

Inspection & Ownership

Last InspectionNovember 2023
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number001321

Nearby Bridges