Pr 3 over Humacao River

Fair Condition63 years old11,800 vehicles/day

Location

StatePuerto Rico
CountyHumacao Municipio
Location0.5 Km W Of Dr. Vidal ST
CarriesPr 3
CrossesHumacao River
Coordinates18.14477, -65.82611

Condition Ratings

Overall ConditionFair
Deck5 (Fair)
Superstructure7 (Good)
Substructure6 (Satisfactory)
Channel/Waterway6 (Satisfactory)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialPrestressed Concrete
DesignStringer/Multi-beam
Total Length196.9 ft (60 m)
Max Span63.0 ft (19.2 m)
Deck Width43.6 ft (13.3 m)
Deck Area798 sq m
Main Spans3
Year Built1963

Traffic

Avg Daily Traffic11,800 (2017)
Truck Traffic4%
Lanes On Bridge2

Inspection & Ownership

Last Inspection723
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number008291

Nearby Bridges